A temporary building
was required in order to overhaul a special generator. The structured
had to be assembled not only over an existing crane but also upon a 2m
high cube system.
Naturally Jansen International was upto the job and assembled the
insulated structure with an eaves height of 6,20 m ready for use within
just a short space of time, complete with lighting, heating and air
conditioning systems.

|